Case Study – Maple Lodge Low Pressure Bio Gas Line

Design and installation of over 200m of pipework.
Individual feed from each digester delivering gas to site.

Processes include:

  • Gas cleaning through foam pots
  • Water extracting via Condensate Pots
  • Gas acceleration though Gas Boosters
  • Gas delivery to boilers and CHP
  • ATEX certified electrical installation
  • Gas flow, gas pressure and fan speed can be monitored inside the Control Room by SCADA link
  • Plus a new MCC to control and monitor the process